Office Renovation Checklist
If you’re handling an office renovation in Singapore, this checklist will help you avoid nasty surprises, stay within budget, and deliver a workspace your team actually wants to work in.
Pre-Planning
- Clarify renovation goals (e.g. hot-desking, more meeting rooms, hybrid-friendly layout)
- Get approval from company leadership and finance
- Set budget buffer for unexpected costs (10–15%)
- Check lease terms: get landlord approval if needed
- Confirm renovation period (day/night work restrictions in office buildings)
- Notify your building management (MCST or landlord) early
- Appoint a main point-of-contact internally
Design & Layout
- Hire a commercial interior designer
- Request 2D and 3D mockups for visual clarity
- Plan power outlet locations based on desk layout
- Allocate space for storage, lockers, and printing area
- Consider acoustic panels if open-plan
- Review aircon needs: add or reposition units if layout changes
- Plan for greenery or biophilic elements (popular in SG now)
Permits & Compliance
- Submit renovation application to building management
- Check URA conservation guidelines (if applicable)
- Apply for SCDF Fire Safety Certificate (FSC) if needed
- Ensure materials meet local fire-rating standards
- Engage a PE (Professional Engineer) if structural or M&E works involved
- Schedule inspections early to avoid delays
Hiring Contractors
- Shortlist BCA-registered contractors (esp. for bigger works)
- Check case studies and visit completed projects if possible
- Confirm who handles permits and submission (you or them?)
- Ask for a detailed work schedule (not just a vague “2-3 weeks”)
- Make payment milestone-based
- Ensure insurance is covered (contractor’s liability & workman’s comp)
Furniture, Fixtures & Tech
- Measure lift and loading bay access for bulky deliveries
- Order early: some lead times for furniture are 4–6 weeks
- Buy surge protectors for high-value equipment
- Check with ID about built-in vs loose furniture (impacts reinstatement later)
- Ensure power sockets and data points match workstation plan
- Secure internet (StarHub/M1/Singtel)
- Plan location for wifi access points
During Renovation
- Schedule weekly check-ins with contractor
- Keep a shared WhatsApp or Telegram group for fast updates
- Monitor noise levels: some office buildings restrict heavy works to after-hours
- Take photos of progress for record-keeping
- Track variations separately, they often blow up costs
- Start planning move logistics 2–3 weeks before completion
Post-Renovation
- Do a joint inspection with contractor before handover
- Check for: paint streaks, cable alignment, lighting consistency, faulty sockets
- Test all systems: lights, aircon, Wi-Fi, phone lines, fire alarms
- Request as-built drawings and warranty documents
- File SCDF or MCST completion forms (if required)
- Plan phased move-in to reduce disruption
- Schedule a deep clean before team returns
- Send out welcome pack or office intro guide to staff
Need Help with Your Office Renovation?
Handling everything on your own can get overwhelming.
Design plans, permits, timelines, contractor issues – it’s a lot.
If you’d rather have someone experienced take the lead, we’re here to help.
We’re an office renovation contractor in Singapore who keeps things clear and straightforward. No pushy upsells, no last-minute surprises – just honest work, delivered on time.
Let’s make this renovation a whole lot easier.
0 Comments