office renovation checklist

Office Renovation Checklist: Singapore Edition

by | Apr 10, 2025

Planning an office upgrade?

This office renovation checklist is built for real-world use – clear, practical, and ready to go. Whether you’re managing it solo or coordinating with a contractor, this checklist covers every key step without the fluff.

Let’s get your space transformed without the stress.

Office Renovation Checklist

If you’re handling an office renovation in Singapore, this checklist will help you avoid nasty surprises, stay within budget, and deliver a workspace your team actually wants to work in.

$

Pre-Planning

  • Clarify renovation goals (e.g. hot-desking, more meeting rooms, hybrid-friendly layout)
  • Get approval from company leadership and finance
  • Set budget buffer for unexpected costs (10–15%)
  • Check lease terms: get landlord approval if needed
  • Confirm renovation period (day/night work restrictions in office buildings)
  • Notify your building management (MCST or landlord) early
  • Appoint a main point-of-contact internally
$

Design & Layout

  • Hire a commercial interior designer 
  • Request 2D and 3D mockups for visual clarity
  • Plan power outlet locations based on desk layout
  • Allocate space for storage, lockers, and printing area
  • Consider acoustic panels if open-plan
  • Review aircon needs: add or reposition units if layout changes
  • Plan for greenery or biophilic elements (popular in SG now)
$

Permits & Compliance

  • Submit renovation application to building management 
  • Check URA conservation guidelines (if applicable)
  • Apply for SCDF Fire Safety Certificate (FSC) if needed
  • Ensure materials meet local fire-rating standards
  • Engage a PE (Professional Engineer) if structural or M&E works involved
  • Schedule inspections early to avoid delays
$

Hiring Contractors

  • Shortlist BCA-registered contractors (esp. for bigger works)
  • Check case studies and visit completed projects if possible
  • Confirm who handles permits and submission (you or them?)
  • Ask for a detailed work schedule (not just a vague “2-3 weeks”)
  • Make payment milestone-based
  • Ensure insurance is covered (contractor’s liability & workman’s comp)
$

Furniture, Fixtures & Tech

  • Measure lift and loading bay access for bulky deliveries
  • Order early: some lead times for furniture are 4–6 weeks
  • Buy surge protectors for high-value equipment
  • Check with ID about built-in vs loose furniture (impacts reinstatement later)
  • Ensure power sockets and data points match workstation plan
  • Secure internet (StarHub/M1/Singtel) 
  • Plan location for wifi access points
plan location wifi access points
$

During Renovation

  • Schedule weekly check-ins with contractor
  • Keep a shared WhatsApp or Telegram group for fast updates
  • Monitor noise levels: some office buildings restrict heavy works to after-hours
  • Take photos of progress for record-keeping
  • Track variations separately, they often blow up costs
  • Start planning move logistics 2–3 weeks before completion
$

Post-Renovation

  • Do a joint inspection with contractor before handover
  • Check for: paint streaks, cable alignment, lighting consistency, faulty sockets
  • Test all systems: lights, aircon, Wi-Fi, phone lines, fire alarms
  • Request as-built drawings and warranty documents
  • File SCDF or MCST completion forms (if required)
  • Plan phased move-in to reduce disruption
  • Schedule a deep clean before team returns
  • Send out welcome pack or office intro guide to staff

Need Help with Your Office Renovation?

Handling everything on your own can get overwhelming.
Design plans, permits, timelines, contractor issues – it’s a lot.

If you’d rather have someone experienced take the lead, we’re here to help.

We’re an office renovation contractor in Singapore who keeps things clear and straightforward. No pushy upsells, no last-minute surprises – just honest work, delivered on time.

Let’s make this renovation a whole lot easier.

FAQs

How long does an office renovation take?
It depends on the size and scope, but most small to mid-sized office renovations in Singapore take about 3 to 6 weeks. Larger projects or major layout changes can take longer. It’s best to factor in time for planning, approvals, and any unexpected delays.
Can you renovate without disrupting work?
Yes, it’s possible – with the right planning. Some companies choose to renovate in phases, work during off-hours or weekends, or even shift teams to a temporary space. A good contractor will help you plan around your team’s schedule to minimise downtime.

About the Author

Marketing

Learn more on this topic

Related Blog Posts

Workplace Productivity Guide

Workplace Productivity Guide

A well-designed office can significantly impact how your team performs day to day. This workplace productivity guide offers practical insights for business owners and office managers who want to improve output through smarter use of space. From layout to lighting,...

Office Lighting Guide

Office Lighting Guide

Looking to upgrade your office lighting but not sure where to start? This office lighting guide breaks down everything you need to know to choose the right lights for productivity, comfort, and style. Whether it’s a home office or business space, get simple tips to...

Ergonomic Office Furniture Guide

Ergonomic Office Furniture Guide

Ergonomic office furniture is all about making your workspace work for you. It helps you sit comfortably, move naturally, and avoid those nagging aches and pains after long hours at a desk. This quick guide will help you understand why it matters and how it can...

Join in the conversation

Leave a Comment

0 Comments